A blog about my vertial axis wind turbine. I am designing and building a vetical axis wind turbine that I will connect to a grid tie inverter. I will try to reduce my carbon emission footprint, and perhaps save some money.
Monday, May 23, 2011
Parts for the Build
A 20 mm threded rod as a shaft.
2 Bearings for the axial support.
2 neodymium magnets, withe the poles opposing each other,forsupporting the vertical load.
50 * 25 *5 mm 20 kg pull force / magnet
Fiat brakedisc for the magnets
12 neodymium magnets 25 mm* 19 mm 25 kg pull force.
Thursday, May 19, 2011
The stator
The stator will be a 9 coil 3 phase stator, in star confuration.
The coils will have 75 turns of 1,5 or 1,8 mm magnet wire
The entire stator will be casted in epoxy resin and mounted on bolts allowing it to be adjusted in height so that the clearence between the stator and the magnets is as little as possible.
The magnet plate
I have decided to use a brakedisc from a Fiat as base for my magnets, It is well balanced solid metal, and should be a good base for the magnets.
The magnets are 25 mm in dia and 15 mm high, The theoretical holdingforce is 22 kg per magnet
I have designed the plate so that I can add a second plate easilly making it a dual fulx alternator.
The magnets will be glued in place with epoxyresin.
Wednesday, May 18, 2011
Calulating the wind power.
I have been doing some math regarding the power of the wind.
The formula i found is
Power output = 0,5 * swept area * air density * v^3
where 0,5 is th betz value = the difference between the power of the wind and what can be generated as electricity.
Air desity= 1,23 since i live close to the sea.
Wind velocity m/s
and swept area 1.44 ( i have decided to make it 1200mm in diameter since that gives alot more drag-force .
Tuesday, May 17, 2011
Rough draft of the design.
Project start
This i s a small blog about my project to build a veritcal axis wind tubine.
It will be built fron scratch, in my garage, hopfully it will be done by the end of 2011.
It will be built fron scratch, in my garage, hopfully it will be done by the end of 2011.